Air Flow Diagnostic Housing

Brief: To produce a customer’s part from 3 drawn items

Design: Universal Fabrications’ engineers responded with a re-designed ‘one-piece’ solution, therefore removing the weld assembly operations

Outcome:

  • 25% reductions on cost per unit
  • Quality of design was enhanced
  • Greater efficiency and aesthetics in creation of product

Channel Tunnel Rail Link

Brief: To engineer a design solution to hold the service pipes for the Channel Tunnel Rail link TBM (Tunnel Boring Machine)

Design: An initial mock quarter pipe of the tunnel was manufactured and fitted with the newly designed brackets and steel work. The concept was presented in Paris and the contract was won

Outcome:
Universal Fabrications Ltd has had much experience with the Tunnelling industry and has since completed significant contracts In the UK, Denmark, Singapore & Hong Kong.